Llistar TÃtols
S'han trobat 12 Ãtems
Llistant Ãtems des de 0 a 12:
Format | Data | TÃtol | Autor |
---|
Format | Data | TÃtol | Autor |
|
11 desembre 2018 |
Assessment and optimisation of the operation of integrated membrane system for wastewater reclamation |
Mamo, Julian
|
|
14 octubre 2020 |
Combining forward osmosis and anaerobic membrane bioreactor technologies for raw municipal wastewater treatment |
Ferrari, Federico
|
|
1 juliol 2011 |
Development of an air-scour control system for membrane bioreactors |
Ferrero, Giuliana
|
|
1 juliol 2011 |
Development of an air-scour control system for membrane bioreactors |
Ferrero, Giuliana
|
|
8 novembre 2011 |
Development of a decision support system for the integrated control of membrane bioreactors |
Monclús Sales, Hèctor
|
|
8 novembre 2011 |
Development of a decision support system for the integrated control of membrane bioreactors |
Monclús Sales, Hèctor
|
|
|
Diagnosis, assessment and optimisation of the design and operation of municipal MBRs |
Gabarrón Fernández, Sara
|
|
16 maig 2014 |
Diagnosis, assessment and optimisation of the design and operation of municipal MBRs |
Gabarrón Fernández, Sara
|
|
17 octubre 2014 |
Integrated operation of membrane bioreactors: simulation and experimental studies |
Dalmau Figueras, Montserrat
|
|
17 octubre 2014 |
Integrated operation of membrane bioreactors: simulation and experimental studies |
Dalmau Figueras, Montserrat
|
|
|
Integrated operation of membrane bioreactors: simulation and experimental studies |
Dalmau Figueras, Montserrat
|
|
1 juny 2021 |
Seguiment d’una planta pilot de bioreactor de membranes (MBR) i validació del sistema de control basat en eines de lògica difusa per a l’optimització energètica |
Pradas Planella, Arnau
|